Highways England Study on Congestion Relief for Colne, Lancashire (March 2019)
Case reference EIR2025/01243
Received 24 June 2025
Published 12 March 2026
Request
I am writing under the Freedom of Information Act 2000 to request access to all documentation relating to the March 2019 Highways England study, commissioned by then-Transport Secretary Chris Grayling, concerning options to relieve traffic congestion in and around Colne, Lancashire.
Please supply the following:
1. Internal and external reports, whether draft or final
2. Strategic Outline Business Case and Stage 1–3 reports (strategic assessment, route analysis, traffic modelling)
3. Environmental, traffic, and cost analyses
4. Correspondence between National Highways and the Department for Transport
Although publicly announced and reportedly concluded by early 2021, the final report has not been made available. If any portion is exempt, please provide a redacted version alongside clarification of the exemption and withheld content.
Response
Please see attached the 31 documents detailed below in response to your request.
Personal information has been withheld under Regulation 13 of the Environmental Information Regulations 2004.
1. Internal and external reports, whether draft or final:
• Q1 M6-A1(m) - Client Scheme Requirements (CSR)_FINAL_V2.1_Redacted
• Q1 M6-A1(m) - DfT IAAP M6 to A1(m) Final_Redacted
• Q1 M6-A1(m) - Risk Register_Redacted
• Q1 M6-A1(m) - Risk Register
• Q1 M6-A1(m) - Stage Management Plan - Traditional Product
Matrix_Redacted
• Q1 M6-A1(m) Risk Management Plan 11112019_Redacted
• Q1 M6-A1(m) Stage 0 SOAR V02_FINAL_Redacted
• Q1 M6-A1(m) Stage 0 Workshop report v1.0_Redacted
• Q1 M6-A1(m) Value Management Delivery Plan
• Q1 M6-A1(m) - Summary Document V2.5 (Public Facing
Document)_Redacted
2. Strategic Outline Business Case and Stage1–3 reports (strategic
assessment, route analysis, traffic modelling):
• Q2 M6-A1(m) - Strategic Outline Business Case (SOBC) v7_Redacted
3. Environmental, traffic, and cost analyses:
• Q3 M6-A1(m) Preliminary Environmental Risk Assessment (PERA)_Redacted
• Q3 M6-A1(m) - Stage 0 - Combined Modelling and Appraisal Report
• Q3 M6-A1(m) - Analytical Appraisal Report (ARR) Final (1)_Redacted
• Q3 M6-A1(m) Stage 0 Appraisal Specification Report (ASR)
V3.1_FINAL_Redacted.
• Q3 COSTS 1 CAPEX F300 Pack II-Segment 2B 3B D2AP_Redacted
• Q3 COSTS 2 CAPEX_F300_Pack_III_Orange_V2
segment_4B_5B_6B_7B2_D2AP_Redacted
• Q3 COSTS 3 CAPEX_F300_Pack_II-Segment_2B_3B_D2M_Redacted
• Q3 COSTS 4 CAPEX_F300__Pack_VII___Segment_8B_D2AP_Redacted
• Q3 COSTS 5 CAPEX_F300_Pack_III_Orange_V2
Segment_4B_5B_6B_7B2_D2M_Redacted
• Q3 COSTS 6 CAPEX_F300_Pack_I-Segment_1_D2AP_Redacted
• Q3 COSTS 7 CAPEX_F300_Pack_I-Segment_1_D2M_Redacted
• Q3 COSTS 8 CAPEX_F300_Pack_IV_Orange_V1
Segment_4B_5B_6B_7B1_D2AP_Redacted
• Q3 COSTS 9 CAPEX_F300_Pack_IV_Orange_V1
Segment_4B_5B_6B_7B1_D2M_Redacted
• Q3 COSTS 10 CAPEX_F300_Pack_V_
Segment_4B_5B_6C__D2M_Redacted
• Q3 COSTS 11 CAPEX_F300_Pack_VI_Segment_7C_D2AP_Redacted
• Q3 COSTS 12 CAPEX_F300_Pack_V
Segment4B_5B_6C__D2AP_Redacted
• Q3 COSTS 13 CAPEX_F300_Pack_VII_Segment_8B_D2M_Redacted
4. Correspondence between National Highways and the Department for Transport:
• Q4 030720PA M6 - A1(M) Study Andrew Stephenson MP Letter
(Final)_Redacted
• Q4 IPDC Pack_Redacted
• Q4 M6 to A1(M) Study Update 03092020 (003) (1)
• Q4 M6 to A1(M) Wider Briefing Pack 16072020c (002)
Documents
- Q1 M6-A1(m) - Client Scheme Requirements (CSR)_FINAL_V2.1_Redacted.pdf (2.7 MB)
- Q1 M6-A1(m) - DfT IAAP M6 to A1(m) Final_Redacted.pdf (195.8 KB)
- Q1 M6-A1(m) - Risk Register_Redacted.pdf (1.9 MB)
- Q1 M6-A1(m) - Stage Management Plan - Traditional Product Matrix_Redacted.pdf (2.6 MB)
- Q1 M6-A1(m) - Summary Document V2.5 (Public Facing Document)_Redacted.pdf (6.9 MB)
- Q1 M6-A1(m) Risk Management Plan 11112019_Redacted.pdf (2.2 MB)
- Q1 M6-A1(m) Stage 0 SOAR V02_FINAL_Redacted.pdf (2.0 MB)
- Q1 M6-A1(m) Stage 0 Workshop report v1.0_Redacted.pdf (1.5 MB)
- Q1 M6-A1(m) Value Management Delivery Plan.pdf (183.7 KB)
- Q2 M6-A1(m) - Strategic Outline Business Case (SOBC) v7_Redacted.pdf (40.1 MB)
- Q3 COSTS 1 CAPEX F300 Pack II-Segment 2B 3B D2AP_Redacted.pdf (302.2 KB)
- Q3 COSTS 10 CAPEX_F300_Pack_V_-Segment_4B_5B_6C__D2M_Redacted.pdf (295.2 KB)
- Q3 COSTS 11 CAPEX_F300_Pack_VI_Segment_7C_D2AP_Redacted.pdf (299.0 KB)
- Q3 COSTS 12 CAPEX_F300_Pack_V-Segment4B_5B_6C__D2AP_Redacted.pdf (296.6 KB)
- Q3 COSTS 13 CAPEX_F300_Pack_VII_Segment_8B_D2M_Redacted.pdf (288.8 KB)
- Q3 COSTS 2 CAPEX_F300_Pack_III_Orange_V2-Segment_4B_5B_6B_7B2_D2AP_Redacted.pdf (294.8 KB)
- Q3 COSTS 3 CAPEX_F300_Pack_II-Segment_2B_3B_D2M_Redacted.pdf (303.5 KB)
- Q3 COSTS 4 CAPEX_F300__Pack_VII___Segment_8B_D2AP_Redacted.pdf (291.6 KB)
- Q3 COSTS 5 CAPEX_F300_Pack_III_Orange_V2-Segment_4B_5B_6B_7B2_D2M_Redacted.pdf (296.3 KB)
- Q3 COSTS 6 CAPEX_F300_Pack_I-Segment_1_D2AP_Redacted.pdf (298.0 KB)
- Q3 COSTS 7 CAPEX_F300_Pack_I-Segment_1_D2M_Redacted.pdf (295.0 KB)
- Q3 COSTS 8 CAPEX_F300_Pack_IV_Orange_V1-Segment_4B_5B_6B_7B1_D2AP_Redacted.pdf (293.4 KB)
- Q3 COSTS 9 CAPEX_F300_Pack_IV_Orange_V1-Segment_4B_5B_6B_7B1_D2M_Redacted.pdf (295.6 KB)
- Q3 M6-A1(m) - Analytical Appraisal Report (ARR) Final (1)_Redacted.pdf (914.7 KB)
- Q3 M6-A1(m) - Stage 0 - Combined Modelling and Appraisal Report (ComMA) V04_FINAL_Redacted.pdf (50.5 MB)
- Q3 M6-A1(m) Preliminary Environmental Risk Assessment (PERA)_Redacted.pdf (5.1 MB)
- Q3 M6-A1(m) Stage 0 Appraisal Specification Report (ASR) V3.1_FINAL_Redacted.pdf (2.0 MB)
- Q4 030720PA M6 - A1(M) Study Andrew Stephenson MP Letter (Final)_Redacted.pdf (129.7 KB)
- Q4 IPDC Pack_Redacted.pdf (3.1 MB)
- Q4 M6 to A1(M) Study Update 03092020 (003) (1).pdf (2.6 MB)
- Q4 M6 to A1(M) Wider Briefing Pack 16072020c (002).pdf (2.6 MB)
This is National Highways' response to a freedom of information (FOI) or environmental information regulations (EIR) request.
You can browse our other responses or make a new FOI request.