M42 Motorway Service Area between Junctions 5 and 6 planned by Extra MSA
Case reference EIR2025/00765
Received 17 April 2025
Published 3 July 2025
Request
Information on the planned M42 Motorway Service Area between Junctions 5 and 6 in Solihull, developer Extra MSA Group Ltd.
Planning permission was granted in 2022 subject to conditions which allow implementation only at a time when access can be achieved from an ALR smart motorway. It is not known when construction may take place. Please provide copy of
-
the appraisal by or for National Highways of the M42 Solihull MSA proposal against current policy (in force in 2025) for Smart Motorways, including All-Lane Running
-
any approvals issued to the Extra MSA Group Ltd in 2024 or 2025 to permit it to construct access to the M42 between Junctions 5 and 6 Please send information requested to plans_cpre_warks@outlook.com (by email attachment or by Dropbox method).
Response
Please see the attached documents for the information National Highways holds within the scope of your request. Please note that the technical note and the drawing are the same attachments referred to in both the 4th January 2024 e-mail to the Department for Transport and also the e-mail of the same day to Arup and Extra.
It is also worth noting that the technical note is not an appraisal document but it was provided to the Department for Transport to support its consideration of the issue.
Please note that redactions have been made to the attached documents under Regulation 13 of the Environmental Information Regulations 2004 for personal information.
Please be aware that this is not a new section of smart motorway but is instead an alteration to an existing stretch.
Documents
- 20231016 M42 J5a MSA mainline proposed operating regime - NH Technical Note 101123 (redacted).pdf (1.2 MB)
- 223839-ARP-HGN-ZZ-DR-CH-001018-Sheet 1 (redacted).pdf (797.6 KB)
- M42 new MSA proposed mainline operating regime J5A to J6 (redacted).pdf (333.8 KB)
- RE M42 new MSA proposed mainline operating regime J5A to J6 (redacted).pdf (500.8 KB)
- RE M42 new MSA proposed mainline operating regime J5A to J6 (redacted).pdf (590.4 KB)
This is National Highways' response to a freedom of information (FOI) or environmental information regulations (EIR) request.
You can browse our other responses or make a new FOI request.